Skip to content

feat(hope): sync durable holistic studies - #140

Open
swang22 wants to merge 1 commit into
Power-Agent:mainfrom
swang22:hope-holistic-validation-sync
Open

swang22 wants to merge 1 commit into
Power-Agent:mainfrom
swang22:hope-holistic-validation-sync

Conversation

@swang22

@swang22 swang22 commented Oct 24, 2026

Copy link
Copy Markdown

Summary

  • sync the HOPE-owned MCP core and holistic protocol tests from HOPE.jl commit dc4d1fc
  • expose reconnect-safe holistic run status plus coordinator/executor/auditor study tools through PowerMCP
  • document the durable annual-GTEP/monthly-PCM validation workflow and source provenance

Verification

  • managed sync check: passed
  • uv run python -m unittest discover -s tests -v: 45 passed, 3 opt-in solver tests skipped
  • uv run --with pytest pytest tests -q -rs: 45 passed, 3 opt-in solver tests skipped
  • the solver-backed annual GTEP / July PCM workflow was previously validated in HOPE.jl PR feat: integrate powerio as the cross-server case exchange substrate #28 and accepted by all 19 audit checks

This branch has not been deployed

No deployments
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant